Temporary Builders Supply Penrith
Proper metered site power on the Endeavour Energy network from the first day of the job.
Every Penrith build needs power on day one: knockdown rebuilds in St Marys, Kingswood and Emu Plains, new homes in Jordan Springs and Glenmore Park, and new houses and sheds on acreage around Mulgoa and Orchard Hills. A temporary builders supply gives the site a metered connection to the Endeavour Energy network, with safety switches and outlets for the trades.
Three kinds of site
Established streets. Overhead mains on poles. A temporary pole stands near the front boundary with an overhead service from the street.
New estates. Underground mains. A site board connects to the boundary pit.
Acreage. The connection point may be on the road frontage, a long way from the build. We set up the supply at the frontage and plan how power gets to the building area.
The order of work
- Permanent disconnection of the old house, if rebuilding
- Site supply installed the same visit
- Build runs on site power
- Permanent supply connected to the new meter board
- Site supply removed
Our power disconnection and reconnection page covers step 1. If the home or shed will be three phase, lodge the three phase power application early.
What we need
- Address and builder contact
- Site plan
- Single or three phase
- Start date
- A retailer account for the site
Shed first, house later
On acreage, owners often build the shed first and live in or work from it while the house goes up. We can set up the supply so the shed’s connection becomes part of the permanent arrangement, avoiding a second set of works.
Heat and storms
Site boards are weatherproof, but summer storms and heat are hard on temporary equipment. If a storm damages the supply, keep clear and call us.
Common hold-ups
No retailer account, the pole in the way of the slab, the wrong number of phases, or demolition booked before disconnection. We cover each at the start.
At handover
We connect the permanent supply, test and certify, and remove the temporary pole or board.
Safety on site
Temporary supplies take a beating: knocked by machinery, splashed with concrete, rained on and baked in the sun. We install them to cope, with the safety switches and protection the rules require. If an overhead line runs near the work area, we can advise on keeping cranes, concrete pumps and scaffold clear of it, and if the risk is high, we can arrange for the line to be isolated or relocated during the critical work.
Moving the supply mid-build
When the driveway is about to be poured or landscaping starts, the site supply sometimes has to move. We can relocate it with a short disconnection if we know a few days ahead. On acreage builds, where the house is far from the frontage, we can plan a site sub-board closer to the work so the trades aren’t running leads across the paddock.
Project builders and multiple sites
Volume builders working several lots in Jordan Springs or Glenmore Park can book site power and final connections across all their sites as one program. We work to their schedules and lodge applications as soon as lot details are confirmed.
Weather on site
Summer storms move fast over Penrith. If one damages the temporary supply, or water gets into the site board, keep clear and call us rather than resetting anything. We’ll make it safe and get the trades back on power as quickly as we safely can, usually the same day.
Book site power
Builders across level 2 electrician Jordan Springs, Glenmore Park and St Marys use us. Call the Penrith level 2 electrician team to book.
Updated
What good temporary builders supply looks like
Temporary Builders Supply across Penrith
Temporary Builders Supply in Penrith: step by step
- Place itWe choose a spot clear of excavation, concrete trucks and scaffold.
- PaperworkWe lodge with Endeavour Energy and tell you what to ask your retailer.
- InstallTemporary pole or site board installed, connected and tested.
- Change overWhen the house board is ready, the home goes live and the site supply comes out.
Related services
Power Disconnection and ReconnectionSafe disconnection and reconnection of the network supply for renovations, demolitions, re-roofing and switchboard work.
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.
Temporary Builders Supply questions in Penrith
Something else on your mind? Call 02 9158 9998 and ask.
We're building a new home on acreage a long way from the road. Where does site power go?
Usually near the connection point on the road frontage, with leads or a site sub-board closer to the build if needed. We plan it with your builder.
Can you supply power for a big shed build first, before the house?
Yes. Many acreage owners build the shed first. We can set up the supply so it becomes part of the permanent arrangement.
Who sets up the meter?
You open a retailer account for the site, and the retailer arranges the meter.